How to Get Plans Stamped by an Engineer: Step by Step
Most permit delays come from missing information, not slow engineers. Follow these steps to get your drawings sealed quickly and accepted the first time.
By the PE Engineer engineering teamUpdated 4 min read
- Start by confirming exactly which sheets or calculations your building department wants sealed.
- Send complete information up front: address, scope, drawings, photos and any plan-check comments.
- The engineer must be licensed in the state where the project is built.
- An engineer will review and may revise drawings before sealing. That review protects your permit.
- Simple stamps and letters often take a few business days; full plan sets take longer.
Step 1: Confirm what needs a stamp
Do not guess. Look at the permit checklist, the counter staff’s notes or the plan-check correction letter. It usually says which items need an engineer: structural drawings, calculations, a truss package, a foundation design, an MEP plan or a letter.
Knowing the exact requirement keeps the scope, and the fee, as small as possible. If the requirement is unclear, call the building department or send it to us and we will interpret it.
Step 2: Gather your information
The faster an engineer can understand the project, the faster it gets sealed. Collect:
- Project address, which sets the code edition and the wind, snow, seismic and frost values
- Scope in a few sentences: what is being built, removed or changed
- Existing drawings or sketches, even hand drawings with dimensions
- Photos of the existing structure, framing or site
- Manufacturer documents for trusses, metal buildings, equipment or racks
- Soils report or survey if one exists
- Plan-check comments, if the project was already submitted
Step 3: Choose an engineer licensed in your state
A building department only accepts a seal from an engineer licensed in the project’s state. Ask any engineer which state licenses they hold, and verify the license on the state board’s website.
Also make sure the engineer handles your type of work: a structural engineer for a beam, a mechanical engineer for HVAC, and so on. PE Engineer covers structural, architectural and MEP drawings in all 50 states, with each set sealed by an engineer licensed where it is built.
Step 4: Get a fixed-fee proposal
A clear proposal lists the deliverables, the fee, the turnaround and what is excluded, such as site visits or surveys. It should also say whether plan-check revisions are included. Ours include revisions within the original scope.
Cost depends on the size and complexity of the work, whether calculations are needed, whether drawings must be created or only reviewed, and how quickly you need them. A single truss stamp costs far less than a full addition set.
Step 5: Review, revisions and sealing
If you already have drawings, the engineer checks them against code and the loads involved. Expect questions and, sometimes, required changes: a larger beam, an extra hold-down, a deeper footing. This is normal, and it is the reason the department trusts the seal.
If you need drawings created, the engineer and drafting team prepare them, run the calculations and check the set before sealing. You receive a sealed PDF set ready to submit, plus calculations where required.
Step 6: Submit and answer plan check
Submit the sealed set. If the reviewer sends comments, forward them right away. Your engineer should answer each comment in writing, revise the affected sheets and reseal them. Our guide to responding to plan check corrections explains how to keep that round short.
How long does it take?
- Truss package or third-party review and stamp: often a few business days, with rush options
- Beam, header or structural letter: often a few business days once photos and measurements are in
- Addition, garage or ADU plan set: typically one to two weeks
- Commercial or multi-discipline sets: scheduled when quoted
Missing information is the biggest cause of delay. Sending everything in step 2 up front can save days.
Mistakes that delay permits
- Hiring an engineer not licensed in the project’s state
- Drawings without the code edition and design loads stated on the sheets
- Mixing a manufacturer’s generic drawings with site-specific requirements
- Changing the design after sealing without having the sheets resealed
- Waiting days to forward plan-check comments to the engineer
Ready to get your plans stamped?
Upload what you have. We confirm what the permit needs and send a fixed-fee proposal, usually the same day.
Your PE Stamped, Permit-Ready Plans Start With One Upload
Send your drawings or describe the project. A licensed engineer reviews it and sends a clear, fixed-fee proposal, often within hours.
- Free and no obligation
- Reviewed by a licensed PE
- Secure file upload
Frequently asked questions
How fast can I get plans stamped?
Simple stamps, truss reviews and letters are often done within a few business days of receiving complete information, and rush service is available. Full plan sets usually take one to two weeks.
Can an engineer stamp plans someone else drew?
Yes, after a full review. The engineer checks the design, adds calculations and requires corrections where needed, then seals the set once it meets the standard.
Do I need to send original CAD files?
No. PDFs, scans and even clear photos of drawings are enough to start. CAD files help when the engineer needs to edit the sheets.
What if the building department rejects the stamped plans?
Send the comments to your engineer. We answer each item, revise and reseal at no extra charge when the changes are within the original scope.
More guides
Get your free proposal today
Tell us where the project is and what you need. Attach any drawings, photos or plan-check comments. A licensed engineer reviews every request.
- Upload your filesPlans, sketches, photos or comments
- Get a fixed-fee proposalUsually the same day
- Receive stamped drawingsSealed by a PE licensed in your state